The Inner Project Manager

roomplanner

Now that the building warrant is in, we need to spend the next few weeks finalising decisions on kitchen, bathroom and flooring options. I started the process earlier this summer, but parked the initial designs when we got consumed with such things as the access road, electrical points and window types, all very essential for the warrant submission.

I didn’t really dare breathe much more on the more cosmetic elements, almost feeling that it was in danger of jinxing things somehow to spend time on this without having all the permissions in place. But on Friday I picked up the phone to the kitchen designer in Scotland, sent him the final room dimensions, and told him that it was time to re-engage.

Lock and load, kitchen designer! I’m back. And with some new ideas!

Poor man….

In some ways the break of six months without fully considering things like tile colours, tap designs and shower fittings has made things easier, and my vision of what we want clearer. I’m more convinced than ever that simple is best, with good quality, natural materials wherever possible. Most of the ideas that I originally hatched six months ago still hold water, but some things have changed, and I’m grateful that we have had that time to alter things.

The inner project manager within me is now itching to list out all the decisions we need to make, create mood boards, check out suppliers, arrange samples, agree visits wherever possible to physically try things out (like the bath), estimate costs, and get on with it…